Ensuring the Availability of Essential Public Services – BCP & DRP
The Business Continuity Plan (BCP) ensures the continuity of priority missions during a crisis.
The Disaster Recovery Plan (DRP) restores information systems to normal operating levels after a major incident.

Availability objective
100%
Availability objective
99,9%
Target RPO
< 15 min
Target service restoration
< 2 h

Why Implement a BCP/DRP?
Maintain citizen-facing services (civil registry, school catering, social support, water, waste management, urban planning…)
✔ Continuity of public services
Civil registry, education, social services, water, waste — even during a crisis.
✔ Reduced impact
Lower financial, legal, and reputational losses.
✔ Protection against major risks
Cyberattacks, outages, weather events, human error.
✔ Compliance & best practices
Alignment with ANSSI, GDPR, and resilience standards.
Démarche en 6 étapes
✅ Governance & Scope — Sponsor, business leads, DPO, CISO, IT department.
✅ BIA (Business Impact Analysis) — MTPD, dependencies, recovery priorities.
✅ BCP Strategy — Organization, fallback sites, crisis remote work, procedures.
✅ DRP Strategy — RPO/RTO targets, service levels, architecture.
✅ Implementation — Immutable backups, replication, automation, runbooks.
✅ Testing & Continuous Improvement — Drills, feedback, KPIs.

Defining RPO & RTO
RPO: maximum acceptable data loss.
RTO: maximum acceptable recovery time.
Set realistic targets based on criticality levels, validated by business units.
Align with the MTPD (Maximum Tolerable Period of Disruption)
Regularly measure actual RPO/RTO during tests
Balance costs vs. service levels
Quick Downtime Cost Estimation
A service interruption can represent far more than a technical outage :
Cost/hour × target RTO
Re-entry cost × number of files/cases
Value of unrecoverable data (RPO)
Requirements & Standards
General Code for Local Authorities, continuity of public service
GDPR: availability and integrity of personal data
RGS / PSSI-E / ANSSI: information system security best practices
Master Plan / Municipal BCP, alignment with crisis management
Expected Deliverables
Process mapping and prioritization (MTPD)
Business Impact Analysis (BIA) & Risk Analysis
Continuity strategy & disaster scenarios
Action plan, procedures, quick-response guides, contact lists
Test reports & yearly updates
Test Plan
Documentation test: procedure review
Technical test: restoration, application failover
Crisis exercise: crisis unit, communication
Chaos engineering: controlled test window
Recommended Frequency
Level 1: quarterly
Level 2: semi-annual
Level 3: annual
Recovery Architecture
Components
VM/database replication (synchronous/asynchronous)
Immutable and encrypted backups (WORM)
Air-gapped object storage / public cloud
Recovery site (cloud, inter-municipal datacenter, another local authority)
Intelligent network services
Dynamic DNS, load balancer, admin bastion
Orchestration scripts/runbooks for failover
Scheduled, non-disruptive failover tests